JAZAN INTEGRATED GASIFICATION COMBINED CYCLE (IGCC) PROJECT.
Location: Jazan Economic City, Saudi Arabia
Time: 2014-2017
Amount of Xiangjia Scaffolding Materials: USD1.2million
Sub-Contractor: SEPCO Electric Power Construction Corporation
Owner: Saudi Aramco
The Jazan IGCC complex, which is to become the largest gasifier-based power facility in the world, will convert vacuum residue to be produced in the adjacent Jazan refinery into synthesis gas (syngas). The gasification unit will have a capacity of 2,110,000 Nm3/h of syngas that will be evenly used to produce purified hydrogen for the refinery and to fuel a combined cycle facility producing utilities and power for the refinery and export to the national grid. Total output of the plant will be of approximately 2,400 MW.