Shenzhen Subway Line 11(Xiangmihu Overpass Bridge)

Project PlaceShenzhen

Construction CompanyChina Railway Tunnel Stock Co., Ltd.

Project NameShenzhen Subway Line 11(Xiangmihu Overpass Bridge)

Height of  the Structure6.5m

Key pointsThe height of the structure varies from transverse direction and machine direction and different loading capacity are required at solid beam area and hollow box girder area. 0.9m*1.2m ledgers are used in solid beam area and 1.2m*1.5m ledgers are used in hollow box girder area.

shenzhen project 3.jpg
shenzhen project 2.jpgshenzhen project 1.jpg