Shenzhen Subway Line 11(Xiangmihu Overpass Bridge)
Project Place:Shenzhen
Construction Company:China Railway Tunnel Stock Co., Ltd.
Project Name:Shenzhen Subway Line 11(Xiangmihu Overpass Bridge)
Height of the Structure:6.5m
Key points:The height of the structure varies from transverse direction and machine direction and different loading capacity are required at solid beam area and hollow box girder area. 0.9m*1.2m ledgers are used in solid beam area and 1.2m*1.5m ledgers are used in hollow box girder area.



_1760193820.png?x-oss-process=image/format,webp)